Monday, September 3, 2012

Lot of prep work had to be done before we started to seal, sweeping the driveway, power washing, filling cracks with filler and patching holes and larger cracks
.
Took both of us several weeks just to dig out weeds and remove moss, and we did not get all the moss off, but we did our best.

June loading up roller with sealer

Applying sealer  to driveway

Finished project

Took two days over Labor Day weekend

But June and I worked very hard to get it done considering how much sealer was used to seal the driveway.